A group of interested Lane students and employees toured the Center Building on Sept. 9, 2015 while it was in the midst of construction. At that point, many areas were far from finished, especially areas of the Learning Commons such as the Library.

As of the beginning of Fall Term, departments have been allowed to move back in, though not all to full capacity. Those involved with the project advise patience as there is still a long punch list of
work left to be done.

This slideshow requires JavaScript.

[adrotate group="3"]